% Made Thermal Boiler accept bus/hatches in all casing locations. $ Fixed the Thermal Boiler not working. $ Fixed bad localizations of Blocks in certain cases. $ Fixed weird LFTR GUI issue, where everything was slot shifting by 1.
Read More(Large boiler specs for anyone interested) If you hover over the Boiler Block (the multiblock's brain) in your inventory it will tell you where the valid spots to put utility blocks are. Usually all blocks (power hatch, input hatch, maintenance hatch, input bus) go on the bottom level, mufflers go on the top middle if it needs one, and for boilers, the output hatches can be on levels 2-4.
Read MoreI'm playing Infitech 2 (1.7.10) and trying to set up a GregTech large bronze boiler, fueled by charcoal produced by eight LV arc furnaces (exactly enough to satisfy its 1 charcoal per second appetite).Have you tried adding a buffer tank for steam between the boiler and
Read MoreThis page is about the Steam Turbine added by GregTech 5. For other uses, see Steam Turbine. The Steam Turbine is a generator from GregTech 5 used to convert Steam into EU. The conversion rate is 2 liters of steam to 1 EU, however the steam turbine is not efficient and there will be some loss. For example, the Basic Steam Turbine has an efficiency rate of 66%, so 2 / 66% means it actually
Read MoreThe Large Boiler is a multiblock structure added by GregTech 5 that burns enormous amounts of solid and liquid fuels to produce enormous amounts of Steam from Water. A Large Boiler can be built from Bronze, Steel, Titanium or Tungstensteel. All versions Burn fuel at the same rate, but produce Steam at different rates. The Large Boiler is constructed as a 3x3x5 Structure. The bottom Layer has
Read MoreAlso, I recommend sticking to high pressure boilers, these are MUCH more efficient with fuel which I imagine being a lot more important early-gregtech. Solar is even better, but their output is quite pitiful. Free is still free though. Also, a general rule of thumb is 1 amp output max unless noted otherwise.
Read More(Large boiler specs for anyone interested) If you hover over the Boiler Block (the multiblock's brain) in your inventory it will tell you where the valid spots to put utility blocks are. Usually all blocks (power hatch, input hatch, maintenance hatch, input bus) go on the bottom level, mufflers go on the top middle if it needs one, and for boilers, the output hatches can be on levels 2-4.
Read MoreThey are fairly interchangeable in positioning. 3. level 1. Chidori001. · 2y FTB: Interactions. As others have mentioned you can use LV. I am also going to mention that you can use LV for the electric blast furnace too since that also is not obvious BUT you need at least 3 LV hatches to get the BF running. 4.
Read More