2009/11/10 · The cooler's air flue is used as the low-temperature venting flue for the AQC boiler; upon maintenance of the AQC boiler, the cement sintering system can operate normally without being disturbed. The first section of the AQC boiler produces 1.35 MPa-340°C overheated steam and the second section produces hot water.
Read Moreboiler) and/or Air Quenching Cooler boiler (AQC boiler), turbine generator and cooling tower Eligibility Criteria 13 Criterion 1 The project utilizes waste heat from a cement production facility by waste heat recovery system (WHR) to generate (SP boiler) and
Read More2009/11/10 · The cooler's air flue is used as the low-temperature venting flue for the AQC boiler; upon maintenance of the AQC boiler, the cement sintering system can operate normally without being disturbed. The first section of the AQC boiler produces 1.35 MPa-340°C overheated steam and the second section produces hot water.
Read MoreWHR system consists of a Suspension Preheater boiler (SP boiler) and/or Air Quenching Cooler boiler (AQC boiler), turbine generator and cooling tower 3. WHR system utilizes only waste heat and does not utilize fossil fuels as a heat source to generate steam for power generation 4.
Read Moreboilers), four air quenching cooler boilers (AQC boilers), one turbine generator and cooling tower one originally designed by JFE Engineering Corporation. Criterion 3 WHR system utilizes only waste heat and does not utilize fossil fuels as a heat source to
Read More2019/9/1 · Along the flow of the hot air, the devices include gravity settler, exhaust heat boiler of air quenching cooler (AQC boiler) and fabric filter (FF 2). Download : Download high-res image (660KB) Download : Download full-size image Fig. 1. Schematic diagrams of the
Read More2007/9/18 · The temperature of exhaust gas A1 of the suspension preheater (PH) is 165 C., and the temperature of exhaust gas A2 of the air quenching cooler (AQC) is 105 C. A PH boiler 10, similarly to Related Art 3 (FIG. 4), has a first evaporator h-2 and a superheater h-1
Read MoreSuspension Preheater boiler (SP boiler) and/or Air Quenching Cooler boiler (AQC boiler), turbine generator and cooling tower. The project WHR systems consist of four Suspensionpreheater boilers (SP boilers), four air quenching cooler boilers (AQC boilers
Read More